1. Power system economics: designing markets for electricity;Stoft,2002
2. Mason T, Curry T, Wilson D. Capital Costs for Transmission and Substations: Recommendations for WECC Transmission Expansion Planning. Western Electricity Coordinating Council; 2012.
3. Seppa TO. Increasing transmission capacity by real time monitoring. In: 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309), vol. 2; 2002. p. 1208–11. doi: 10.1109/PESW.2002.985201.
4. International Council on Large Electric Systems, Guide for the selection of weather parameters for bare overhead conductor ratings, Standard, CIGRE; 2006.
5. Powerline Ampacity System: Theory, Modeling and Applications;Deb,2017