Author:
Ghajar Raymond F.,Billinton Roy
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology
Reference23 articles.
1. A report prepared by the reliability test system task force of the application of probability methods subcommittee, ‘IEEE reliability test system’. IEEE Trans PAS 1979;PAS-98(6):2047–54.
2. Consumer interruption costing for reliability cost/benefit evaluation;Poore;IEEE Trans PAS,1983
3. Cost/benefit approach to establish adequacy level for generating system planning;Oteng-Adjei;IEE Proc Part C,1988
4. Utilization of interrupted energy assessment rates in generation and transmission system planning;Billinton;IEEE Trans PWRS,1991
5. Evaluation of the marginal outage costs of generating systems for the purposes of spot pricing;Billinton;IEEE Trans PWRS,1994
Cited by
51 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献