1. ENTSO-E, Challenges and opportunities Report; 2016.
2. P.W. Group, Technical Requirements for Frequency Containment Reserve Provision in the Nordic Synchronous Area, Draft, ENTSO-E Nordic; Jun. 2017.
3. E. Commission, Network code on requirements for grid connection of generators; Apr. 2016. URL https://www.entsoe.eu/network_codes/rfg/.
4. A standard method for specifying the response of hydroelectric plant in frequency-control mode;Jones;Electric Power Syst Res,2004
5. Performance assessment of primary frequency control responses for thermal power generation units using system identification techniques;Wang;Int J Electr Power Energy Syst,2018