Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology
Reference84 articles.
1. The Central Committee of the CPC and the State Council. Several Opinions on Further Deepening the Reformation of Electric Power System ([2015] No. 9). Available at http://tgs.ndrc.gov.cn/zywj/201601/t20160129_773852.html.
2. Pay-as-bid based reactive power market;Amjady;Energ Convers Manage,2010
3. Competition in the UK market for electricity generating capacity: A game theory analysis;Exelby;Energy Policy,1993
4. Optimal bidding strategies and modeling of imperfect information among competitive generators;Wen;IEEE Trans Power Syst,2001
5. Some analytical results pertaining to Cournot models for short-term electricity markets;Ruiz;Electr Power Syst Res,2008
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献