Funder
Brookhaven National Laboratory
Office of Electricity
U.S. Department of Energy
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology
Reference23 articles.
1. PSS/E 33.4 program operation manual;Siemens Industry Inc.,2013
2. A White Paper on the Incorporation of Risk into Planning Process. Available at: https://pubs.naruc.org/pub.cfm?id=536DCF19-2354-D714-5117-47F9BA06F062.
3. Larangeira G, Yogarathnam Y, Yue M, Dong F. Exact Quantification of System Reliability Indexes in Probabilistic Contingency Analysis. In: 2021 IEEE PES general meeting. 2021, p. 1–5.
4. Risk-based transmission planning,2014
5. Incorporation of risk analysis into transmission planning,2016