1. IEC 60300-3-3 “Dependability Manage – Life Cycle Costing”.
2. Estimation of transient overvoltages in gas insulated busduct from 220kV gas insulated substation;Kondalu;Int J Comput Appl (0975-8887),2011
3. Kondalu M, Subramanyam Dr.P.S. Estimation of re-striking transient overvoltages. In: A 3-phase 132kV gas insulated substation.
4. Novák Balázs. Geometry optimization to reduce enclosure losses and outer magnetic field of gas insulated busbars.
5. Mitigation of transient overvoltages generated due to switching operations and lightning in gas-insulated substation (GIS) Without extra limiter;Tavakoli;Iranian J Electr Electron Eng,2011