1. New results on no-wait flowshop scheduling;Agnetis,1989
2. Design criteria for flexible production systems based on non-simultaneous demand models;Agnetis,1990
3. Just-in-time scheduling in a pipeline manufacturing system;Agnetis,1989
4. Part type selection and optimal scheduling in flexible flow systems;Agnetis,1990
5. Part routing in fass;Agnetis;IEEE Thins. on Robotics and Automation,1990