1. Aeschbach M. The Lotschberg base tunnel-connecting Europe. Ingenieurburo fur Bauwesen und Umwelt; 2002.
2. Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station;Gong;Eng Geol,2012
3. Rostami J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure [Doctoral dissertation]. Golden, CO, USA: Department of Mining Engineering, Colorado School of Mines; 1997.
4. TBM performance estimation in rock using QTBM;Barton;Tunn Tunn Int,1999
5. Development of a rock mass characteristics model for TBM penetration rate prediction;Gong;Int J Rock Mech Min Sci,2009