1. Rock Mechanics Design in Mining and Tunneling;Bieniawski,1984
2. Bruland, A., 1998. Project Report 13A-98 Drillability Test Methods, p. 18.
3. Cerchar Institute, 1986. Cerchar Abrasivity Index Plan. Report issued by Centre d’ Etudes de Charbonnages de France (CERCHAR) 1986 GAI-JTr/JS no. 86-538.
4. Development of a new direct test method for estimating cutter life based on the Sievers’ J miniature drill test;Dahl;Tunnelling and Underground Space Technology,2007
5. Trademarking the NTNU/SINTEF drillability test indices;Dahl;Tunnels & Tunnelling International,2010