Author:
Wang Yujie,Cao Ruilang,Pi Jin,Jiang Long,Zhao Yufei
Funder
National Key R&D Project of China
China Institute of Water Resources and Hydropower Research
National Natural Science Foundation of China
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference23 articles.
1. Study on numerical modeling method of the prestressed tunnel lining with unbonded curve anchored tendons;Cao;J. China Inst. Water Resour. Hydropower Res.,2016
2. A theoretical approach for analysis of the interaction between grouted rock bolts and rock masses;Fahimifar;Tunneling Underground Space Technol.,2005
3. 3-D finite element analysis of post-prestressed concrete lining;Kang;J. Tianjin Univ. Sci. Technol.,2006
4. Structure optimization of the prestressed tunnel lining with un-bonded circular anchored tendons;Kang;J. Hydraul. Eng.,2014
5. Conceptualizing Chinese engagement in south-east Asian dam projects: evidence from Myanmar’s Salween river;Kirchherr;Int. J. Water Resour. Dev.,2017
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献