Author:
Merisalu Johanna,Sundell Jonas,Rosén Lars
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference60 articles.
1. Adam, A., Josephson, P.-E., & Lindahl, G. (2015). Implications of cost overruns and time delays on major public construction projects. Paper presented at the Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate.
2. Tätning av bergtunnlar–förutsättningar, bedömningsgrunder och strategi vid planering och utformning av tätningsinsatser;Andersson;Retrieved from,2000
3. Use of fragility curves to assess the seismic vulnerability in the risk analysis of mountain tunnels;Andreotti;Tunn. Undergr. Space Technol.,2019
4. Identifying environmental impacts of underground construction;Attanayake;Hydrogeol. J.,2006
5. Foundations of risk analysis;Aven,2012
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献