1. Analysis of performance of tunnel boring machine based systems;Abd-Al Jalil,1998
2. TBM tunnelling in jointed and faulted rock;Barton,2000
3. Bieniawski Z. T., Celada B., Galera J. M. (2007). TBM Excavability; Prediction and Machine and Rock interaction. Proceedings of RETC, Toronto, Canada, pp 1118-1130.
4. Bruland, A. (1998). Advance Rate and Cutter Wear, Hard Rock Tunnel Boring Machine, Volume 3 of 10. Ph.D. dissertation. Trondheim Norwegian University of Science and Technology (NTNU).