Author:
Liu Xinrong,Liu Yongquan,Qu Wanbo,Tu Yiliang
Funder
National Natural Science Foundation of China
2015 Chongqing University Postgraduates’ Innovation Project
Fundamental Research Funds for the Central Universities
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference17 articles.
1. Effects of important factors on surface settlement prediction for metro tunnel excavated by EPB;Chakeri;Tunn. Undergr. Space Technol.,2013
2. Shallow tunnelling method (STM) for subway station construction in soft ground;Fang;Tunn. Undergr. Space Technol.,2012
3. Key techniques and risk management for the application of the Pile-Beam-Arch (PBA) excavation method: a case study of the Zhongjie subway station;Guan;Sci. World J.,2014
4. Behaviour of pile subject to excavation-induced soil movement;Leung;J. Geotech. Geoenviron. Eng.,2001
5. A new construction method for a metro station in Beijing;Liu;Tunn. Undergr. Space Technol.,2000
Cited by
24 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献