1. AITES-ITA Working Group No. 14, 2000. Recommendations and Guidelines for Tunnel Boring Machines (TBMs). .
2. Askilsrud, O.G., Moulton, B.G., 1998. Tunnel boring machines. Mechanical Tunnelling, Raise Boring and Shaft Drilling Short Course, February 21–22, Colorado School of Mines, Golden.
3. Balci, C., Ozaydin, Y., 2012. Analysis of the tunnel boring machine (TBM) performance parameters in Ayazaga-Cayirbasi Water Tunnel Project (Section III) in Istanbul. EUROCK 2012, Stockholm.
4. Barla, G., 2000. Lessons Learnt from the Excavation of a Large Diameter TBM Tunnel in Complex Hydrogeological Conditions, GeoEng2000. In: International Conference on Geotechnical & Geological Engineering, 19–24 November 2000, Melbourne, Australia.
5. Barla, G., Pelizza, S., 2000. TBM tunnelling in difficult ground conditions. In: GeoEng2000, International Conference on Geotechnical & Geological Engineering, 19–24 November 2000, Melbourne, Australia.