1. Acaroglu, O., 2002. The developed computer program employed for performance and dynamical analysis of roadheaders. In: Proceedings of the 6th National Rock Mechanics Symposium, Konya, September 2002, pp. 113–121.
2. Acaroglu, O., 2004. Stability Analysis of the Boom Type Tunnelling Machines and Optimum Selection. PhD Thesis, Istanbul Technical University, Turkey.
3. The effect of cutting head shapes on roadheader stability;Acaroglu;Min. Technol. IMM Trans. Sect. A,2005
4. A new method to evaluate roadheader operational stability;Acaroglu;Tunn. Undergr. Sp. Technol.,2006
5. Using a roadheader for underground gold mining;Breitrick;Min. Eng. (March),1998