1. Frozen ground engineering;Andersland,2004
2. The unfrozen interfacial phase in frozen soil water systems;Anderson;Ecological Studies, Analysis and Synthesis,1973
3. Subsoil freezing during the building of the Fürth underground;Bayer;Tunnel,2002
4. Bosshard, M., 1990. Zur Projektierung des Bauloses 2.04 – Bahnhofquai/Limmat. Projektierung und Bau der S-Bahn Zürich, R. Fechtig, Glättli, M., pp. 216–228 (in German).
5. Colombo, G., Lunardi, P., Cavagna, B., Cassani, G., Manassero, V. 2008. The artificial ground freezing technique application for the Naples underground. In: Proceedings of Word Tunnel Congress 2008 on Underground Facilities for Better Environment and Safety, Agra, India, pp. 910–921.