Author:
Han Jiaqiang,Wang Fei,Wang Zihao,Geng Pengqiang,Liu Fang,Weng Miaocheng
Funder
Graduate School, Chongqing University
Graduate Scientific Research and Innovation Foundation of Chongqing
Chongqing Construction Science and Technology Plan Project
Chongqing Science and Technology Commission
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference55 articles.
1. Calculation of response time of ceiling-mounted fire detectors;Alpert;Fire Technol.,1972
2. Study on temperature distribution and CO diffusion induced by cable fire in L-shaped utility tunnel;An;Sustain. Cities Soc.,2020
3. An, W., Wang, T., Liang, K., Tang, Y., Wang, Z., 2020b. Effects of interlayer distance and cable spacing on flame characteristics and fire hazard of multilayer cables in utility tunnel. Case Stud. Therm. Eng. 22.
4. The Influence of Tunnel Geometry and Ventilation on the Heat Release Rate of a Fire;Carvel;Fire Technol.,2004
5. Entrainment in fire plumes;Cetegen;Fire Saf. J.,1981
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献