Author:
Zhang Zhe,Qin Yong,Jia Limin
Funder
Fundamental Research Funds for the Central Universities
National Natural Science Foundation of China
State Key Laboratory of Rail Traffic Control and Safety
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference43 articles.
1. An improved hybrid algorithm for the set covering problem;Al-Shihabi;Comput. Ind. Eng.,2015
2. The role of survey details for wayfinding problem in complex pedestrian underground interchange with poor architectural configuration;Barati;Tunn. Undergr. Space Technol.,2021
3. Making the usage of guidance systems in pedestrian infrastructures measurable using the virtual environment DAVE;Bauer;Transp. Res. Part F: Traffic Psychol. Behav.,2018
4. BS 5499 Part 1, 1990, Fire Safety Signs, Notices and Graphic Symbols, Part 1, Specification for Fire Safety Signs;British Standards Institution,1990
5. Maximum coverage capacitated facility location problem with range constrained drones;Chauhan;Transp. Res. Part C: Emerg. Technol.,2019
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献