1. Tunneling: A Decade of Progress;Bezuijen,2005
2. Alkali-activated cements opportunities and challenges;Della;Cem. Concr. Res.,1999
3. Simultaneous backfill grouting pressure development in construction phase and in the long-term;Hashimoto;Tunn. Undergr. Space Technol.,2004
4. Back-fill grouting model test for shield tunnel;Koyama;Rail. Tech. Res. Inst. Quart. Rep.,1998
5. Theoretical study on synchronous grouting filling patterns and pressure distribution of EPB shield tunnels;Li;Chin. J. Geotech. Eng.,2010