1. Achariam, N., 2014. Tunnelling work near Bkt Bintang to end soon. New Straits Times, 31 May 2014.
2. AFTES, 2005. Slurry for use in slurry shield TBMs. Recommendations – Special Issue – GT4R4A1.
3. Anagnostou, G., Kovari, K., 1996. Face stability in slurry and EPB shield tunneling. In: Mair, R.J., Taylor, R.N. (Eds.), Proc. Int. Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, Balkema, 453–458.
4. Anon, 2014a. Monitoring focus following KL sinkhole incident. Tunnels and Tunnelling, 21 May 2014.
5. Anon 2014b. Sinkhole caused by Seoul Metro construction. Tunnels and Tunnelling, 18 August 2014.