1. Construction results table;CMTA,2022
2. Earth Balance pipe jacking work results table;EBPJA,2012
3. 4000mm Inner Diameter Super Large Diameter Pipe Jacking Method for Sewer Main Line Maintenance (Proceedings of the 48th Sewerage Research Conference);Handa;Sewer Research Presentation Lecture Collection,2011
4. On the application of slurry micro-tunneling method in Vietnam, Geotechnics for Sustainable Infrastructure Development;Hoang,2020
5. Progress and maturity of the pipe jacking method, and further progress;Ishikawa;J. Sewerage,2015