Author:
Ninic Jelena,Alsahly Abdullah,Vonthron Andre,Bui Hoang-Giang,Koch Christian,König Markus,Meschke Günther
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference78 articles.
1. Advanced finite element modeling of excavation and advancement processes in mechanized tunneling;Alsahly;Adv. Eng. Softw.,2016
2. From building information modeling to real time simulation in mechanized tunneling;Alsahly,2016
3. Alsahly, A., Marwan, A., Gall, V., Scheffer, M., Koenig, M., Meschke, G., 2018. Bim-to-fem: Incorporating numerical simulations into bim concepts with application to the wehrhahn-line metro in düsseldorf. In: Proceedings of the ITA-AITES World Tunneling Congress (WTC 2018).
4. Alsahly, A., Hegemann, F., König, M., Meschke, G., 2020. Integrated bim-to-fem approach in mechanised tunnelling. Geomech. Tunnell. 13 (2), 212–220, doi:10.1002/geot.202000002. arXiv:https://onlinelibrary.wiley.com/doi/pdf/10.1002/geot.202000002.
5. Weak imposition of constraints for structural membranes in transient geometrically nonlinear isogeometric analysis on multipatch surfaces;Apostolatos;Comput. Methods Appl. Mech. Eng.,2019
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献