Author:
Festa D.,Broere W.,Bosch J.W.
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference16 articles.
1. Bezuijen, A., Talmon, A.M., 2008. Processes around a TBM. In: International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground. CRC Press, Special Lecture.
2. Bezuijen, A., Talmon, A.M., 2009. Processes around a TBM. In: Proceedings of the International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, Shanghai, 2009.
3. Festa, D., 2015. On the Interaction between a Tunnel Boring Machine and the Surrounding Soil. Doctoral Thesis. Delft University of Technology, ISBN 978-90-823282-0-2.
4. Festa, D., et al., 2011. Tunnel-boring process in soft soils: improved modelling for reliability enhancement. Kinematic behaviour and tail grouting monitoring. In: ITA-AITES World Tunnelling Conference, Helsinki.
5. An investigation into the forces acting on a TBM during driving – mining the TBM logged data;Festa;Tunnel. Undergr. Space Technol.,2012
Cited by
46 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献