1. Analysis and control of subsidence due to earth pressure shield tunneling in Passante Ferroviario of Milano;Chiorboli,1996
2. EPB shield tunneling in mixed face conditions;Clough;Journal of Geotechnical Engineering,1993
3. Evaluation of soil response to EPB shield tunneling;Finno;Journal of Geotechnical Engineering,1985
4. Neural Networks: A Comprehensive Foundation;Haykin,1999
5. Herrenknecht GmbH, 1996. Technical Documentation: Project No. S-142, Subway Bangkok, submitted to MRTA.