Author:
Li Zili,Soga Kenichi,Wright Peter
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference39 articles.
1. ABAQUS Inc., 2010. ABAQUS User’s Manual, Version 6.10. SIMULIA. .
2. Barratt, D.A., O’Reilly, M.P., Temporal, J., 1994. Long term measurement of loads on tunnel linings in overconsolidated clay. In: Tunnelling’94, London, pp. 469–481.
3. Three-dimensional structural analyses of the shield-driven “green heart” tunnel of the high-speed line south;Blom;Tunn. Undergr. Space Technol.,1999
4. Correspondence on A.M. Muir Wood;Curtis;Geotechnique,1976
5. The assessment of limits for the movement of subway tunnels and trackwork due to adjacent construction;Doran,2000
Cited by
39 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献