Author:
Liao Shao-Ming,Cheng Chi-Hao,Chen Li-Sheng
Funder
National Basic Research Program of China
Natural Science Foundation of China (NSFC
Shanghai Committee of Science and Technology, China
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference31 articles.
1. The central artery/tunnel project preservation program;Bower;Historical Archaeol.,1998
2. Central artery/tunnel project: Boston’s engineering Marvel—where we are now;Chandra;PCI J.,2001
3. Cheng, L., 2011. A study on the development strategy of Shanghai Caohejing High-Tech Park. Master's thesis, Shanghai Jiaotong University (in Chinese).
4. Field performance of concrete pipes during jacking in cemented sandy silt;Cui;Tunnell. Undergr. Space Technol.,2015
5. Design management in design-build megaprojects: SR 99 bored tunnel case study;Gatti;Pract. Periodical Struct. Des. Constr.,2014
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献