1. Amberg, R. 1992. Economic aspects when building tunnels with major overburden. Tunnel 3/92, 120-124.
2. Amberg, F., 2008. Amberg Engineering AG (Personal Communication, February 2008).
3. Anagnostou, G., 2007. Continuous tunnel excavation in a poro-elastoplastic medium. In: Tenth International Symposium on Numerical Models in Geomechanics, NUMOG X, Rhodes, Taylor & Francis Group, London, pp. 183–188.
4. Anagnostou, G., 2009. The effect of advance-drainage on the short-term behaviour of squeezing rocks in tunnelling. In: International Symposium on Computational Geomechanics (COMGEO I), Juan-les-Pins, International Centre for Computational Engineering Rhodes, pp. 668–679.
5. Anagnostou, G., Cantieni, L., 2007. Design and analysis of yielding support in squeezing ground. In: The second half century of rock mechanics, 11th Congress of the International Society for Rock Mechanics (ISRM), Lisbon, vol. 2. Taylor & Francis Group, London, pp. 829–832.