1. Back analysis of time-dependent behaviour of a test gallery in claystone;Boidy;Tunnelling and Underground Space Technology,2002
2. Stress determination by back-analysis of excavation-induced stress changes – A case study;Kaiser;Rock Mechanics and Rock Engineering,1990
3. Kirsten, H.A.D., 1976. Determination of rock mass elastic moduli by back analysis of deformation measurement. In: Proceedings of Symposium on Exploration for Rock Engineering, Johannesbuerg, pp. 1154–1160.
4. Discussion on parameters of surrounding rocks during tunnel excavation and discrimination of ground stress;Lu;Chinese Journal of Rock Mechanics and Engineering,1988
5. Maier, G., Jurina, L., Podolak, K., 1977. On model identification problems in rock mechanics. In: Proceedings of Symposium on the Geotechnics of Structurally Complex Formations, Capri, pp. 257–261.