1. Step change in the context of comminution;Bearman;Minerals Engineering,2013
2. Ballantyne, G.R., Powell, M.S., Tiang, M., 2012. Proportion of energy attributable to comminution. In: Proc. 11th Mill Ops. Conf., Hobart, pp. 25–30 (AusIMM).
3. Ballantyne, G.R., Powell, M.S., 2014a. Benchmarking comminution energy consumption for the processing of copper and gold ores. Miner. Eng. (submitted for publication).
4. Ballantyne, G.R., Peukert, W., Powell, M.S., 2014b. Size specific energy (SSE) – energy required to generate minus 75 micron material. Int. J. Miner. Proc. (submitted for publication).
5. Bartholomew, K.M., McIvor, R.E., 2013. Classification system efficiency – a comprehensive closed-circuit grinding optimisation metric. In: Proc. World Gold Conf., Brisbane, September, pp. 389–394 (AusIMM).