1. Hydrocyclones in dewatering circuits;Firth;Miner. Eng.,2003
2. An investigation into tailings deep cones efficiency improvement at miduk copper complex;Garmsiri,2008
3. The effect of grain size on flocculant preparation;Garmsiri;Miner. Eng.,2014
4. The effect of suspension properties on shear yield stress and compressibility of the suspension of copper flotation tailings;Garmsiri;Appl. Rheol.,2018
5. An analysis of the influence of cylinder dimension ratio and lifting velocity on the slump test results;Garmsiri;Appl. Rheol.,2015