1. Not another HPGR trade-off study!;Amelunxen;Minerals and Metallurgical Processing,2011
2. Optimization of operating parameters for coarse sphalerite flotation in the HydroFloat fluidised-bed separator;Awatey;Minerals Engineering,2013
3. Ballantyne, G.R., Powell, M.S., Tiang, M. (2012). Proportion of energy attributable to comminution. In: Proceedings of 11th Mill Operators’ Conference 2012, Hobart, October 2012, pp. 25–30.
4. Northparkes Mines;Butcher,2011
5. Estimating the volatility of mining projects considering price and operating cost uncertainties;Costa Lima;Resources Policy,2006