1. Influence of deposit morphology on the kinetics of copper cementation on pure iron;Annamalai;Hydrometallurgy,1979
2. Bryson, L.J., Hofirek, Z., Collins, M.J., Stiksma, J., Berezowsky, R.M., 2008. New matte leaching developments at Anglo Platinum’s base metal refinery. In: Young, C.A., Taylor, P.R., Anderson, C.G., Choi, Y. (Eds.), Hydrometallurgy 2008: Proceedings of the 6th International Symposium, SME, pp. 570–579.
3. Chemical Hydrometallurgy: Theory and Principles;Burkin,2001
4. Determination of the relative leaching kinetics of Cu, Rh, Ru and Ir during the sulphuric acid pressure leaching of leach residue derived from Ni–Cu converter matte enriched in platinum group metals;Dorfling;Minerals Engineering,2010
5. A mineralogical study of the phases formed during the CuSO4–H2SO4–O2 leaching of nickel–copper matte;Dutrizac;Canadian Metallurgical Quarterly,1987