Author:
Song Xianzhi,Li Gensheng,Xu Zhengming,Shah Subhash
Reference5 articles.
1. Critical conditions for effective sand-sized solids transport in horizontal and high-angle wells;Duan;SPE Drilling & Completion,2009
2. Effective heavy post-fracturing proppant cleanout with coiled tubing: experimental study and field casing history;Li,2006
3. How to efficiently remove sand from deviated wellbores with a solids transport simulator and a coiled tubing cleanout tool;Li,2002
4. Mechanistic model for cuttings removal from solid bed in inclined channels;Ramadan;J. Petroleum Sci. and Eng.,2001
5. Repeatedly increased efficiency and success rate from a new solids-cleanout process using coiled tubing: a review of recent achievements from more than 100 operations;Sach;SPE Production & Operations,2008