1. Introduction to material management;Arnold,1998
2. Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems;Ho;International Journal of Production Research,1995
3. The effect of freezing the master production schedule on cost in multi-level MRP systems;Kadipasaoglu;Production and Inventory Management,1995
4. Material requirement planning;Orlicky,1975
5. Survey of literature on continuously deteriorating inventory models;Raafat;Journal of the Operational Research Society,1991