1. Abboud, N. E. (1995). Production lot sizing with machine breakdowns: a simulation study. Proceedings of the First LAAS International Conference on Computer Simulation (pp. 263–268).
2. A simple approximation of the EMQ model with Poisson machine failures;Abboud;Production Planning and Control,1997
3. Abboud, N. E. & Remeily, H. E. (1995). An approximate model to the production lot-sizing problem with Poisson machine breakdowns and low failure rate. Proceedings of the International Conference on Industrial Engineering and Production Management (pp. 33–42). Marrakech.
4. Optimality of zero inventory policies for unreliable manufacturing systems;Bielecki;Operations Research,1988
5. Joint determination of preventive maintenance and safety stocks in an unreliable production environment;Cheung;Naval Research Logistics,1997