1. Carroll, D. C. (1965). Heuristic sequencing of jobs with single and multiple components. Ph.D. thesis. Sloan School of Management, MIT
2. Time completion for various dispatching rules in job shops;Elvers;OMEGA,1983
3. A hybrid approach to sequencing jobs using heuristic rules and neural network;Kim;Production Planning and Control,1995
4. A heuristic to minimize the total weighted tardiness with sequence-dependent setups;Lee;IIE Transactions,1997
5. Lee, Y. H., & Pinedo, M. (1992). Scheduling jobs on parallel machines with sequence-dependent setup times. Technical report, Columbia University