Author:
Murata Tadahiko,Gen Mitsuo,Ishibuchi Hisao
Subject
General Engineering,General Computer Science
Reference6 articles.
1. Multi-objective flow-shop scheduling;Daniels;Naval Research Logistics,1990
2. Local search algorithms for flow shop scheduling with fuzzy due-dates;Ishibuchi;Intl. J. of Production Economics,1994
3. Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems;Ishibuchi;Fuzzy Sets and Systems,1994
4. Relations between conventional scheduling problems and fuzzy scheduling problems;Ishibuchi,1996
5. Reformulation of various non-fuzzy scheduling problems using the concept of fuzzy due-date;Murata,1997
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献