1. Guidance on The Design and Construction of Offshore Installation;Department of Energy - UK,1984
2. Recommended practice for planning, designing, and constructing fixed offshore platforms;American Petroleum Institute,1986
3. Non-linear analysis of composite tubular joints;Elnashai;PhD thesis, Imperial College, University of London,1984
4. An analytical model for plain and weld-beaded grouted pile/sleeve connections;Elnashai;Progress Report to the Steering Committee of the Grout and Grouting Managed Programme,1986
5. Grouted pile-to-sleeve connection test;Lamport,1986