1. Recovery of biological phosphorus removal after periods of low organic loading;Temmink;Water Sci Technol,1996
2. Teichfischer T. Möglichkeiten zur Stabilisierung des Bio-P Prozesses. Veröffentlichungen des Inistitutes für Siedlungswasserwirtschaft und Abfalltechnik. Heft 92, Hannover, Germany (in German).
3. Microbial competition for the organic substrates and its impact on EBPR systems under conditions of changing carbon feed;Carucci;Water Sci Technol,1999
4. Impact of excessive aeration on biological phosphorous removal from wastewater;Brdjanovic;Water Res,1998
5. Krühne U, Isaacs SH, Jørgensen SB. Modeling of biological phosphorus removal data with the activated sludge model No. 2 and an extended version incorporating denitrifying PAO. Proceedings of the European conference on new advances in biological nitrogen and phosphorus removal from municipal or industrial wastewater, Narbonne, France, October 12–14, 1998. p. 239–46.