1. Atkins, 2009. Post Opening Project Evaluation Meta-Analysis Summary Report. Report to the Highways Agency, March 2009.
2. Learning from ex ante/ex post cost – benefit comparisons: the Coquihalla highway example;Boardman;Socio-Econ. Plan. Sci.,1994
3. Transports: choix des investissements et coûts de nuisances;Boiteux,2001
4. Chevroulet T. (Ed.), 2008. Deliverable 4.1 Report on the findings and outcomes of Workshop 1, Workshop Proceedings, Annex. EVA-TREN. Improved Decision-Aid Methods and Tools to Support Evaluation of Investment for Transport and Energy Networks in Europe.
5. Cost-benefit analysis of the high-speed train in Spain;de Rus;Ann. Reg. Sci.,1997