1. Cashflow requirements and the flow of funds for some Nigerian contractors;Wahab,1976
2. Construction project planning—A computerised critical path network for small and medium sized construction firms;Ogunlana,1984
3. An evaluation of technical manpower at craft, supervisory and managerial levels in some selected number of construction firms in Nigeria;Dada,1984
4. Improving productivity in the Nigerian construction industry—a managerial approach;Okwa,1981
5. A comparative study of output and productivity on some selected sites;Olomolaiye,1984