Author:
Shen Xiaoning,Guo Yinan,Li Aimin
Funder
National Natural Science Foundation of China
Natural Science Foundation of Jiangsu Province of China
Qing Lan Project of Jiangsu Province of China
Reference67 articles.
1. Software Engineering;Sommerville,2011
2. The software project scheduling problem: a scalability analysis of multi-objective metaheuristics;Luna;Appl. Soft Comput.,2014
3. X. Wu, P. Consoli, L.L. Minku, G. Ochoa, X. Yao, An evolutionary hyper-heuristic for the software project scheduling problem, in: Proceedings of the Fourteenth International Conference on Parallel Problem Solving from Nature, PPSN’16, 2016, pp. 37–47.
4. Software project scheduling problem in the context of search-based software engineering: A systematic review;Rezende;J. Syst. Softw.,2019
5. A survey on the software project scheduling problem;Vega-Velázquez;Int. J. Prod. Econ.,2018
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献