1. Genetic algorithms for optimization of a mine system under uncertainty;Kumral;Prod. Plan. Control,2004
2. Stochastic production phase design for an open pit mining complex with multiple processing streams;Asad;Eng. Optim.,2013
3. Open Pit Mine Planning and Design;Hustruilid,2006
4. Early start and late start algorithms to improve the solution time for long term underground mine scheduling;Topal;J. S. Afr. Inst. Min. Metall.,2008
5. A heuristic approach to long-range production scheduling of cement quarry operations;Asad;Prod. Plan. Control,2011