Author:
Tsai Jinn-Tsong,Yang Ching-I.,Chou Jyh-Horng
Reference64 articles.
1. Industrial Scheduling;Sule,1996
2. A genetic algorithm for flowshop scheduling with fuzzy processing time and due date;Wu,2004
3. An application of genetic algorithms for flow shop problems;Chen;European Journal of Operational Research,1995
4. Genetic algorithms for flowshop scheduling problems;Murata;Computers & Industrial Engineering,1996
5. A study on flowshop scheduling problem combing Taguchi experimental design and genetic algorithm;Cheng;Expert Systems with Application,2007
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献