Author:
Chen Tin-Chih Toly,Lin Yu-Cheng
Funder
Ministry of Science and Technology, Taiwan
Reference61 articles.
1. Factory cycle-time prediction with a data-mining approach;Backus;IEEE Trans. Semicond. Manuf.,2006
2. R. Schelasin, Using static capacity modeling and queuing theory equations to predict factory cycle time performance in semiconductor manufacturing, in: Proceedings of the 2011 Winter Simulation Conference, 2011, pp. 2040–2049.
3. New approaches to due date assignment in job shops;Baykasoğlu;European J. Oper. Res.,2008
4. Scheduling and due date assignment to minimize earliness tardiness, holding, due date assignment and batch delivery costs;Shabtay;Int. J. Prod. Econ.,2010
5. Common due date assignment and scheduling with a rate-modifying activity to minimize the due date earliness, tardiness, holding, and batch delivery cost;Yin;Comput. Ind. Eng.,2012
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献