1. Baluch H. Trends in the investigation of CWR track in view of contemporary operational requirements. Proc Sci Tech Symp Construction and Maintenance of CWR Track, Cracow-Zakopane, Poland, Cracow University of Technology, December 1996, pp. 1–9.
2. Towpik K. Investigation on CWR track for the needs of International Railway Union (UIC). Proc Sci Tech Symp Construction and Maintenance of CWR Track, Cracow-Zakopane, Poland, Cracow University of Technology, December 1996, pp. 115–21.
3. Wysiatycki K, Brzozowski A, Koc W. Determination of virtual operational character of the CWR track in view of proof ground test results. Science Publication of the Technical University of Gdansk, No. 272, Civil Engineering XXXI, 1977, pp. 289–306.
4. Kish A, Kalay S, Hazell A, Schoengart J, Samavedam G. Rail longitudinal measurement evaluation studies using the track loading vehicle. Bulletin AREA No. 742, 1993, pp. 315–42.
5. Measuring lateral and longitudinal track strength;Kalay;Railway Track and Structures,1994