1. The Beijing ISOL initial conceptual design report
2. The Beijing ISOL Initial Conceptual Design Report, IAC Meeting for BISOL Facility, 2012/10, Beijing, China.
3. A. Mosnier, The IFMIF 5MW linacs, in: Proceedings of LINAC08, Victoria, Canada, 2008 pp. 1114–1118.
4. E. Petit, Progress of the spiral-2 project, in: Proceedings of IPAC2011, 2011, pp. 1912–1916.
5. I. Mardor, D. Berkovits, I. Gertz et al., The SARAF CW 40MeV proton/deuteron accelerator, in: Proceedings of SRF2009, Berlin, Germany, 2009, pp. 74–80.