1. Pellet-clad interaction (PCI) failures of zirconium alloy fuel cladding–a review;Cox;J. Nucl. Mater.,1990
2. C. Energy, Enhanced CANDU 6® technical summary, Tech. rep., tech. rep., Candu Energy, Mississauga, ON (2012).
3. A probabilistic integrity assessment of flaw in zirconium alloy pressure tube considering delayed hydride cracking;Kwak;Int. J. Modern Phys. B,2003
4. M.B. Elmoselhi, K. Tashiro, A.C. Wallace, Hydrogen ingress into zirconium alloys as a life-limiting factor–methods of in-line monitoring, prediction and control, in: 2012 20th International Conference on Nuclear Engineering and the ASME 2012 Power Conference, American Society of Mechanical Engineers, 2012, pp. 301–307.
5. Delayed hydride cracking of spent fuel rods in dry storage;Kim;J. Nucl. Mater.,2008