Author:
Lee Jinho,Yim Hee-Joong,Hashimoto Takashi,Park Young-Ho,Hwang W.,Park Sung-Jong,Jeong Jae-Won,Heo Seongjin,Yoo Kyoung-Hun,Yeon Yeong-Heum,Park Dong-Joon,Kim Jaehong,Kang Byoung-Hwi,Moon Jun-Young,Shin Taeksu
Funder
National Research Foundation of Korea
Korea Ministry of Science ICT and Future Planning
Ministry of Science, ICT and Future Planning
Subject
Instrumentation,Nuclear and High Energy Physics
Reference19 articles.
1. Commissioning preparation of RAON rare isotope accelerator facility
2. SPES Technical Design Report, INFN-LNL-223;Prete,2013
3. The SPES multi-foil direct target
4. M. Lindroos, et al. M. Lindroos, M 2004, CERN-AB-2004-086.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Design and commissioning of the ISOL beamline at the RAON facility;Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms;2024-11
2. Cryopanel and fast closing valve system for ISOL beam operation;Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms;2024-05