1. American Nuclear Society, 2021. Release of La Crosse and Zion Sites for Unrestricted Use Delayed until 2022. https://www.ans.org/news/article-3241/release-of-la-crosse-and-zion-sites-for-unrestricted-use-delayed-until-2022/.
2. Blue Ribbon Commission on America's Nuclear Future, 2012. Report to the Secretary of Energy. https://www.energy.gov/sites/prod/files/2013/04/f0/brc_finalreport_jan2012.pdf.
3. Cooper, J.G., 2016. The Pilgrim Nuclear Power Station Study: A Socioeconomic Analysis and Closure Transition Guide Book. Landscape Architecture & Regional Planning Masters Projects. 76. Retrieved from https://scholarworks.umass.edu/larp_ms_projects/76.
4. CY Today, 2000, as cited in Yamamoto, D., Feikens, J., Haller, M., 2020. Nuclear-to-Nature Land Conversion. Geographical Review 111, no. 3, 415–36. https://doi.org/10.1080/00167428.2020.1799212.
5. Department of Energy, 2019. Solar Integration: Solar Energy and Storage Basics. Energy.gov. Accessed January 22, 2023. https://www.energy.gov/eere/solar/solar-integration-solar-energy-and-storage-basics.